Waterproofing Risk Assessment

This work plan briefing also informs employees of potential hazards, methods to eliminate those hazards, as well as developing a job specific safety checklist. With local knowledge and industry experience, Iron Fish brings a strategic eye to every project. Using a systematic method of looking at your work activities by first completing a suitable Risk Assessment and then creating a safe system of work on the Method Statement form you will go a long way to ensuring the safety of. FARM SAFETY SELF-ASSESSMENT. To inform the employees, the general public and the. Test frequently and allow longer than. it is a checklist of various hazardous factors, associated with any business. chemical, physical and ergonomically) were considered, the severity of the risk factor, the frequency of exposure to the risk factor and possibility of. In all cases, the risk assessmemt ought to be finished for any activity or job, before the activty starts. MS 6 Safety Method Statement – Roofing accordance with the manufacturer's directions. Select Page. These conditions are often considered to be constant, but particularly burial depth can change significantly because of factors like seabed mobility. A project includes both a risk assessment and method statement, along with COSHH assessments on Advanced plan and above. Here is the Method Statement for Liquid Applied Bituminous Waterproofing. Risk Assessment Assessing risks that have been identified. Studies cite that 58 percent of patients 65 and older have problems eating. 10mm fall Waterproofing layers at zero falls will only be accepted if the waterproofing membrane has a third party assessment specifically for that use. Avoid dampness, seepage or leakage in concrete structures by water-proofing your home. Employers should however ensure that employees remain up-to-date with Tetanus and Polio vaccinations. They contain specific guidance, which shall only be used in connection with works on motorways and trunk roads in England, subject to any specific implementation instructions contained within an IAN. Products - Task Risk Assessments - COSHH Assessments - Safety Data Sheets About Us Our Story Our Team Sevronian Events The Mission The Vision Blog Careers. Physical demands of a tiler. Method Statement & Risk Assessment Project Name: CRAIGENDORAN RISING MAIN Location of the Works: CRAIGENDORAN, HELENSBURGH. Provides for more aesthetically pleasing finishes. If the person has slipped down the roof from the ridge, considerable. 1000151 Corpus ID: 45844493. This report analyzes the performance of walls clad with HardiePlank fiber cement siding and compares them to traditional stucco assemblies. BSB41419 Certificate IV in Work Health and Safety is a Nationally Accredited course delivered and assessed by Master Builders Association of Victoria (RTO no. Introduction Designing basements to be both waterproof and gas resistant is a relatively straight forward process on most sites. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. It protects the employer from criminal liability and proves compliance to the Occupational Health and Safety Act and Regulations. 5 Risk Assessments are to be reviewed: • Annually. NRCA CEO Reid Ribble will speak with ConstructReach May 5 as part of its series addressing the state of the construction industry amid the COVID-19 crisis. Examples of workplace hazards include: frayed electrical cords (could result in electrical. When it comes to commercial roofing and metal replacement, every job is unique. Flat Roof: Flat roofs tend to be be prone to leaks and such need to be waterproofed and well-mantained. Therefore, the risk assessment needs to focus on exposure to fume. Falls and manual handling assessment — patients may need assistance to get to the toilet The results of these assessments should help to identify if the individual is at risk of developing a moisture lesion. The HeidelbergCement group has been running a risk assessment survey in respect of child labour and human rights violations since 2013. Search for:. Failure to adhere to an ECEX risk assessment is a disciplinary offence and may result in immediate dismissal. In the US, ANSI (American National Standards Institute) standards that define Risk Assessment, such as B100. Risk Assessment checklist. The identification of hazards, the evaluation of their risks and the putting in place of control measures to secure the health and safety of employees is a major element for managing health and safety under the Safety, Health and Welfare at Work Act, 2005. reducing unnecessary procedures that may cause harm or risk to mother and baby, and reducing depression, substance use, and domestic violence during and after pregnancy. Risk Assessments form the bedrock of any plant & equipment safety system. See the complete profile on LinkedIn and discover Poonam’s connections and jobs at similar companies. To control and contain incidents. Once completed a copy of the risk assessment is to be retained by the Service Area and a copy is to be sent to the Corporate Safety Team. COMMERCIAL REROOFING. (SGH) is a national engineering firm that designs, investigates, and rehabilitates structures, building enclosures, and materials. Those responsible for the young people are strongly advised to conduct their own risk assessment, particularly taking into account the nature of the young. Suicide Risk Assessment Doesn't Work New research suggests it doesn’t help—and it may hurt—to rely on a formula to predict the risk of a suicide By Declan Murray , Patrick Devitt on March 28. In truth, a risk assessment doesn’t need to be half as complicated or technical as it sounds. Provide waterproof jackets and bottoms to keep dry. Unit Leaders' and Instructors' Risk Management Steps for Preventing Cold Casualties Risk Management is the Process of Identifying and Controlling Hazards to Protect the Force Possible Outcomes of Inadequate Climatic Cold • Chilblain (due to bare skin exposed to cold humid air) • Immersion Foot (Trench Foot) (due to wet feet) • Frostbite. Procedure for Containment Level 2 (CL2) Additional requirements over CL1. It is important that we understand how the chemicals we use can affect our body, it is how we learn to deal with them in a risk free manner. Risk factors that can cause injury such as MSDs (Musculoskeletal Disorders) can be found in virtually every workplace from commerce to agriculture, health services to construction. doc Page 6 of 44 Aug07 5. Contractor. The Certificate IV in Security and Risk Management focuses on developing and monitoring Security Risk Assessments (SRAs). bizSAFE is a five-step programme that assists companies to build up their WSH capabilities so that they can achieve superior improvements in safety and health standards at the workplace. Don't use duvets, quilts, baby nests, wedges, bedding rolls or pillows. Medicine; Published 2014; DOI: 10. 1 Return to Section 5. Discover more every day. Grace & Co. How to apply for your waterproofing risk assessment: Initially we would ask you to complete and return the application form below, together with relevant drawings, but we may also need to visit the site and monitor/inspect the waterproofing system before completing the risk assessment. pesticides and water pollution fact sheet The term "pesticide" is a composite term that includes all chemicals that are used to kill or control pests. Approved Installers To ensure the installation matches the high quality of WIDOPAN products, only approved contractors who have been trained in our products can undertake an installation. To minimize damage to property and environment. Introduction Designing basements to be both waterproof and gas resistant is a relatively straight forward process on most sites. Skip to content. Tough, tear-resistant waterproof paper, with 60 spiral-bound lined pages (30 leaves), ideal for notes and drawings. 33% (1 in 75) chance in any given year. Method of Statement Construction of Flat Concrete Floor For PT. [email protected] Environmental Chemistry Consultants Nancy Rothman, PhD and Susan Chapnick, MS of New Environmental Horizons are recognized technical experts in analytical chemistry, quality assurance, data assessment, and data validation of environmental measurements. For example if risk assessment has calculated that a patient is not at risk, but erythema due to pressure occurs after a period of time on a certain support surface, then clinical judgement would deduce that a higher specification surface should be employed. Site evaluation. Ontario's Occupational Health and Safety Act (OHSA) states that employers must take every reasonable. Position the automatic hot air welding machine with the pressure wheel approximately 3mm over the weld edge to ensure a sealed edge. Group leaders undertaking field work must assess the risks and these will vary in accordance with weather and site conditions on the day and the experience, age,. With local knowledge and industry experience, Iron Fish brings a strategic eye to every project. There are specific precautions to take when preparing and applying hot rubberized asphalt. They include a thorough review of relevant national and international scientific literature, as well as critical assessment of data supplied by the applicant. Our management team performs a pre-work job hazard assessment, which is presented to all technicians at the Job Safety Analysis Briefing. Include photographs and test data in the report, so that. We offer the following services: aeration, ventilation and roof insulation, modification of roof framing, general roof repairs, waterproofing and exterior siding, snow removal, pre / post purchase inspection and gutter cleaning. When the waterproofing is installed roll. So why would you want to fly in rain just because you think your aircraft is waterproof or has some miracle nano coating. The webinar explored the BS8102 specification and design principles for a successful waterproofing strategy, looked at different system choices and their application with case studies including Berkeley Home's Royal Arsenal Riverside […]. The high impact ABS and polycarbonate case is o-ring sealed and waterproof use in the rain and submerged illumination. Leptospirosis, also called Weil's disease, is an infection you can catch from animals. Ways to Reduce Risk The risk of injury or death due to electricity is closely related to where and how the electrical equipment is used. Risk Assessment Plan: The primary objectives of the Risk Assessment Plan are to: • Identify hazards associated with contract tasks and activities; • Determine the level of risk; and • Establish appropriate risk control measures. Safety Services Direct is an online health and safety retailer, offering H&S equipment and training courses including UKATA Asbestos Awareness Training. PVC A generic term for single ply plastic sheet membrane. Studies cite that 58 percent of patients 65 and older have problems eating. Drained cavity construction The Code deals with ground water assessment, drainage and associated risk assessments and buildings partly, and fully, below ground as well as both deep and shallow basements. The information contained in the Material Safety Data Sheet does not constitute and assurement of workplace risks. Typical examples of construction types:. A project includes both a risk assessment and method statement, along with COSHH assessments on Advanced plan and above. TIP: Quality waterproof outer jackets and pants may be hired from our resort however due to health regulations you will need to purchase your own gloves and beanies. Prescription Ordering Service. Publication Date: 2008 Risk Assessment. Continue reading Assessing Sites with a View to Assessing Risk. Site evaluation. To safeguard employees and people in vicinity. Use a firm, flat and waterproof mattress in good condition. Strong gloves to be worn at all times. Fall Risk Assessment The Johns Hopkins Fall Risk Assessment Tool (JHFRAT) was developed as part of an evidence-based fall safety initiative. risk assessment is completed and the waterproofing system is specified or installed. 6: Serious Injury (LD>30 days) 4 : Highly Probable. The extensive range includes safety log books, vehicle log books, tool logs books and waterproof log book. Testing is an important part of making sure that your project risk is lower and manageable. Personal protective equipment for eye and face protection should comply with OSHA 1910. School trips will not run in RISK ASSESSMENT IS A CONTINUOUS PROCESS, ANY SIGNIFICANT CHANGE WILL. waterproofing roof risk assessment. PVC A generic term for single ply plastic sheet membrane. The gradual physical changes of aging add up to increased fall risk for older adults. Find your yodel. However, some below ground construction projects require protection from both water ingress and gas contamination. Leptospirosis is spread in the pee of infected animals – most commonly rats, mice, cows, pigs and dogs. is located in Sparks, NV, United States and is part of the Roofing, Siding, & Sheet Metal Contractors Industry. RCDs offer a level of personal protection that ordinary fuses and circuit-breakers cannot provide. The DuoTech Approach. This is important because the greatest driver of risk, is essentially how much water there is, or potentially will be in the ground, to pressure upon the basement structure and waterproofing system(s). Position an extension lead carefully to prevent any risk of damage. Please note: see the OSH Answers Risk Assessment for more information about risk assessments in general, and how to rank hazards. Use elevated work platform or cherry picker Establish no-go area around area of work. With flood protection measures we estimate that the property is protected to a higher standard. The purpose of the application of waterproofing is to prevent the water to percolate or penetrate into any underground concrete members. With experience also in estimating, project scheduling, risk assessment and equipment testing, Graham is a great all-rounder project manager within the BUSS team. Include non-destructive investigation (e. Cumulative Risk Assessment: Non-Carcinogenic Plus Carcinogenic Risk Calculation of Hazard Indices resulted in identifying 39. Salvador & M. Clothing needs to be comfortable and it is advisable, if you continue walking, to have a waterproof jacket and over-trousers. A wide range of tools has been developed to help with supply chain risk assessment and mitigation. TILEO and risk assessment. Ideally, the fire suppression system should allow operators time to shut down computer equipment and cover it with waterproof covers before releasing the suppressant. The identification of hazards, the evaluation of their risks and the putting in place of control measures to secure the health and safety of employees is a major element for managing health and safety under the Safety, Health and Welfare at Work Act, 2005. 1 Selection of protective equipment must [ 7] be based on an assessment of the risk of transmission of microorganisms to the patient, and the risk of contamination of the healthcare worker's clothing and skin by patients' blood, body fluids, secretions or excretions. factors can cause controls that are established and implemented for a prolonged period to lose their effectiveness in risk assessment. Risk Assessment Plan: The primary objectives of the Risk Assessment Plan are to: • Identify hazards associated with contract tasks and activities; • Determine the level of risk; and • Establish appropriate risk control measures. Tiling - Wall and Floor Construction - Waterproofing Enter Search Words Search. The information and recommendation contained above are based on data and measures believed to be correct. Construction hazards with suggested options for making work safer. Dual J/K thermometer with alarms. PU injection grouting is the new must-have building material. This work plan briefing also informs employees of potential hazards, methods to eliminate those hazards, as well as developing a job specific safety checklist. The information and recommendation contained above are based on data and measures believed to be correct. Make sure you do a complete assessment of heart rate before beginning CPR. We can also provide waterproofing consultants that will design, specify and inspect the waterproofing installation work. This cavity drain membrane system is a water management system that is not designed to block water ingress but simply controls any water that enters the structure to an evacuation point which removes the water to external drains. Flood risk from surface water. Weight of the tent. In this paper, water-control and its influencing factors in deep excavation were researched from sealing, draining and dewatering, and then fault tree of waterproofing was set up. Waterproofing Design Philosophy. Welding safety measures are designed to protect employees from welding hazards. If a tool has damaged insulation, it is no longer safe to use - destroy and replace it right away. Moreover, saving you to redecorate, which is every homeowner's worst. CCW Warranty Program. They are widely used in the manufacture of flexible and rigid foams, fibers, coatings such as paints and varnishes, and elastomers, and are increasingly used in the automobile industry, autobody repair, and building insulation materials. prescriptions; visit prescriptions. Lung Cancer Risk Assessment Tool. , infrared thermography) if moisture infiltration is suspected. The past cases of accident indicated water was a key one of accident resource. The German Federal Institute for Risk Assessment (BfR) "Identify risks - Protect health" - this is the guiding principle for the work of the German Federal Institute for Risk Assessment (BfR) in the field of consumer health protection. Lautenberg Chemical Safety for the 21st Century Act (LCSA). job safety analysis for waterproofing jsa water proofing. Medicine; Published 2014; DOI: 10. The level and length of time of exposure, as well as the stage of the pregnancy at time of exposure, can come into play. Providing PFAS risk assessment and education. (SGH) is a national engineering firm that designs, investigates, and rehabilitates structures, building enclosures, and materials. Risk-based decisions should consider scientific, regulatory, and societal factors, as well as costs and benefits. Design Flow Chart Assess the risks from external environment, then adopt a waterproofing strategy capable of achieving client's requirements. The Risk Assessment Information System has a new look! Added features include a comment/feedback form on all pages at the bottom, quick links to all staff, and updated searching capabilities. tanneries and clothing manufacturers where waterproofing or a protective film is needed. High Performance Felt Roofing. 1 Hazardous Substances of the 2007 OHS Regulations. do not suck the wound. El-Sayegh (2008) presented risk assessment and allocation problem, Han et al. Roof membrane to seal openings greater than 5mm; ASSESSMENT OF RISKS. Risk assessment helps to minimise the possibility of the workers or the environment being harmed due to work-related activities. Risk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite Job/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS. Checklists for hazardous substances There are a large number of checliksts reps can use to check whether chemicals (substances) are being properly managed and that the employer is complying with duties under the Part 4. You can catch it if: soil or freshwater (such as from a river, canal or lake) containing infected pee. 2C Assess the risk of harm from identified hazards 72. Beaucare® Medical Ltd. Flood risk from surface water. 10mm fall Waterproofing layers at zero falls will only be accepted if the waterproofing membrane has a third party assessment specifically for that use. Waterproofing - all masonry work, basements, foundations, leaks; Outdoor kitchens, fireplaces, fire pits, water features and falls; Patios and Paths - brick, stone, pavers, Tree Service - Certified Arborist including Tree Risk Assessment. They contain specific guidance, which shall only be used in connection with works on motorways and trunk roads in England, subject to any specific implementation instructions contained within an IAN. Fingers have the highest risk of injury of all the parts of the hand. used in the scoping exercise, and what may be required for the improvement of the baseline HIRA in the future. Procedure 3. RA,COSHH,MSDS Screed & Waterproofing. Journal of the Architecture Institute of Korea 25 (4): 161-168 Google Scholar. [3] Risk assessment: Risk assessment is the process where you: Identify hazards; Analyze or evaluate the risk associated with that hazard; Determine appropriate ways to eliminate or. CO 4 COSHH Assessment for Bitumen Based Roofing & Waterproofing Membranes Area Hazard(s) Person(s) at Risk Worst Case Scenario Risk Control Measures Needed Confirm PPE Needed Issued All Areas Fire if Ignited May cause gastro irritation if swallowed May cause irritation as a result of contact with eyes. A hot works permit will be issued by the Site Supervisor prior to any hot works and a minimum of 1no. Tool Risk Assessment/ Introduction/ Use/ Maintenance Peeler Please note: This Risk Assessment is a guidance document and should be adapted to suit your own Outdoor Learning environment. OSHA strongly recommends that a risk assessment be conducted and that it should include the implementation of a plan for risk mitigation and that the. In addition, a pressure ulcer risk assessment should also be undertaken. A waterproofing membrane is a thin layer of material used to prevent water from contacting another material that it is placed over. If using a cable drum extension lead, it. Poonam has 4 jobs listed on their profile. 1000151 Corpus ID: 45844493. The information and recommendation contained above are based on data and measures believed to be correct. Include photographs and test data in the report, so that. Our capabilities serves to predict, identify, and respond to the needs of buildings and properties throughout their entire life cycle, including the provision of commissioning services, condition assessments and field testing services, maintenance and capital expenditure planning, technical. Dependency in bed 3. What are the offences and penalties related to the Workplace Safety and Health (Risk Management) Regulations?. Reliability assessment of waterproofing systems of buildings underground parts. is the UK leader in care home supplies. The building surfaces are made water-resistant and sometimes waterproof. Control Measures against Falls 11 3. risk assessment is completed and the waterproofing system is specified or installed. Waterproofing from inside is much more cost effective than exterior basement waterproofing. Apply SPF 30+ sunscreen to all exposed skin areas. You should use a firm and flat mattress that is protected by a waterproof cover. Failure to adhere to an ECEX risk assessment is a disciplinary offence and may result in immediate dismissal. Assessing Sites with a View to Assessing Risk. 4 Test for resistance to thermal shock (sheet membranes) 36 7. Air Conditioning / Refrigeration. Barbour Service Update. In the meantime, you can access our resources page to use a free method statement and risk assessment template for your construction safety needs. The goal of the Assessment and Repair of Earthquake Damage Project is to develop guidelines that provide a sound technical basis for use by engineers, contractors, owners, the insurance industry, building officials, and others in the post-earthquake context. Meaning of risk assessment. chemical, physical and ergonomically) were considered, the severity of the risk factor, the frequency of exposure to the risk factor and. In 2018, the European Chemicals Agency’s (ECHA) Risk Assessment Committee unanimously concluded that DINP did not show adverse effects on the sexual function, fertility or development of the fetus. D -30/7, TTC Industrial Area MIDC - Turbhe Navi Mumbai - 400705 Maharashtra Email : Info. What does risk assessment mean? Information and translations of risk assessment in the most comprehensive dictionary definitions resource on the web. A study on the weight decision and risk abstraction for life cycle cost analysis of the waterproofing methods in structure roof which considers a risk probability. This guide adopts a risk-based approach to the design and assessment of flood defences and therefore considers the performance of the whole flood defence system under a wide range of conditions, including extreme floods. Flood risk from groundwater. However,if in adequate attention is paid to it during design or exe cution, it can become extremely expensive to repair after the structure starts leaking. The Waterproofing Safe Work Method Statement breaks the waterproofers work activity into logical job steps, lists the typical hazards associated with each of these steps, and describes the control measures implemented to eliminate or control the risk for the waterproofers safety. used in the scoping exercise, and what may be required for the improvement of the baseline HIRA in the future. The hazards experienced in the sealant, waterproofing, and restoration industry are common to the construction industry in general. Cover with a waterproof plaster. Risk Assessment - Backfilling Around Foul Sewer and Storm Warter Manholes. Typical examples of construction types:. Safety when working with epoxy and hardener. ALLTEC designs, fabricates, and supervises the installation of catenary systems. Scope: Application of polymer modified bitumen liquid membrane with cement screed for non-insulated roof slab. A lot of companies do not do the maintenance regularly so if it has been more than 2 years since your last check, then there is a high risk or a problem. Workers must be trained in the safe work procedures for your facility so they understand the steps and equipment they must use to work safely. Of greatest importance in risk assessment is a consideration of the skills and behaviour of the students about to tackle a practical activity; a procedure that is safe for one group of individuals may need to be modified. You have to carry out a risk assessment. This is the original legislation published in 1977 that governs all building and construction work in South Africa. A SWMS is a written document that sets out the high risk construction work activities to be carried out at a workplace, the hazards and risks arising from these activities and the measures to be put in place to control the risks. Chemical risk assessments. Best Practice Guidance - Type C Waterproofing Systems (BS 8102: 2009) a risk assessment should be carried out. Monitor weather conditions during day and leave site if risk exceeds safe limit. rack your brains and think of all the things that could go wrong) and to be objective in the assessment. You have unlimited access to the entire content library of activities and tasks to create your project from. accepted if the waterproofing membrane has a third party assessment specifically for that use. Cost: Members - $60 / Eligible non-Members - $90. Severity Factors 8: Fatality, Permanent Disability. • Core samples and moisture content readings. On completion of the risk assessment this page should be signed by the assessor and the relevant Assistant Director or Head of Service. Suicide Risk Assessment Doesn't Work New research suggests it doesn’t help—and it may hurt—to rely on a formula to predict the risk of a suicide By Declan Murray , Patrick Devitt on March 28. Risk Assessment DRBS Activity / Exercise CF Water Safety Test Assessor D. Confirm the suitability of the walls to receive treatment. Wet-seal Waterproofing Casey/Frankston/North East Melbourne. Risk Assessment Plan: The primary objectives of the Risk Assessment Plan are to: • Identify hazards associated with contract tasks and activities; • Determine the level of risk; and • Establish appropriate risk control measures. The German Federal Institute for Risk Assessment (BfR) "Identify risks - Protect health" - this is the guiding principle for the work of the German Federal Institute for Risk Assessment (BfR) in the field of consumer health protection. Remove castings from the box. ‘Risk assessment’ is an ominous phrase to many and throws up visions of health and safety breaches, red tape and high-vis jackets. Published under licence by IOP Publishing Ltd IOP Conference Series: Materials Science and Engineering, Volume 365, Issue 5. Extremely High Risk, High Risk, Moderate Risk and; Low Risk. Personal Protective Equipment. DOCUMENT TIMING AND NATURE OF EXPOSURE To make a thorough assessment of the injury a clear history including the timing of the exposure should be documented. This report analyzes the performance of walls clad with HardiePlank fiber cement siding and compares them to traditional stucco assemblies. If the consequences cannot be mitigated, you will have to dealt with them in a contingency plan. Now made of waterproof "Rite in the Rain" Paper. Licenced to: Mr Robert Vos. Waterproofing - all masonry work, basements, foundations, leaks; Outdoor kitchens, fireplaces, fire pits, water features and falls; Patios and Paths - brick, stone, pavers, Tree Service - Certified Arborist including Tree Risk Assessment. After Stanley completed the works for interior water-proofing, we decided to appoint him to fix the waterproofing for the exterior walls as well. CHRYSO India Private Limited Plot No. Dependent on the outcome of the risk assessment, BS 8102 recommends the use of two waterproofing systems in more critical cases. Waterproofing shall be extended up vertical surfaces minimum 100 mm or as indicated in the shop drawings. Flood risk from surface water. Provide waterproof jackets and bottoms to keep dry. Graves and Ringuest (2009) analysed probabilistic dominance criteria for comparing uncertain alternatives. The objective of this this baseline risk assessment is to inform the Principal contractor of the occupational health and safety risk factors to which persons will be exposed when renovating / demolition of structures/building. Precast concrete is widely used in the New Zealand construction industry. (SGH) is a national engineering firm that designs, investigates, and rehabilitates structures, building enclosures, and materials. 2 Safe Access onto Roof 12. available data on the health effects of occupational exposure to asphalt and asphalt fumes. Document workplace hazards, risk ratings and control measures. To safeguard employees and people in vicinity. For example: drainage measurement container, non-sterile gloves, waterproof pad, alcohol swab: 3. Reduces the risk of leaks. They must also be developed in consultation with your workplace safety and health committee or representative and be approved by management. • Used the current best practice methods to numerically model the ground: structure behaviour and establish the required lining thicknesses and structural requirements. Instant Download of Documents and Procedures for the Australian Building and Construction Industry to assist Developers, Builders, Tradespeople and Owner Builders. ‘Risk assessment’ is an ominous phrase to many and throws up visions of health and safety breaches, red tape and high-vis jackets. The high impact ABS and polycarbonate case is o-ring sealed and waterproof use in the rain and submerged illumination. Use protective equipment when needed. Scope of works The task involves the installation of HDPE Rising Main and includes the following works:. ASSESSMENT DATE: 8th March 2019 waterproof clothing. ABP - Spray applied liquid Waterproof ing and car park deck systems No Heat, No Flame, Reduced Risk Assessment CI/SfB 47 Ln 2 MAR 2008 DWS DEUTSCHE WATERPROOFING SYSTEMS Fast - cures in seconds Guarantee - up to 20 years Cost effective. of pages Eleven Description of work Replacement AHU on xxxx Building Date Issued 03/02/17 Date(s) of Work 01/03/17 to 28/03/17. The appropriate waterproofing measures to consider, type A, B or C or a combination of the three. More specifically in areas where fume can concentrate up. In high-risk areas, radon has a tendency to seep through basement cracks. Waterproofing structures offers protection to structural components, buildings, and installations from the penetration of water; it reduces risk and will prolong the life time of the structure. These include health hazards; such as asphalt fumes, lead, silica, and solvents; as well as safety hazards, such as falls from elevation, awkward and heavy lifting, flammables, and power tools. Failure to adhere to an ECEX risk assessment is a disciplinary offence and may result in immediate dismissal. Carrying out COSHH Assessments on site should be a major priority, in many circumstances substances such as paint are not seen as very dangerous, a comment we have all heard is "I used this at home and didn't need to assess it" The example below outlines the risks and reduction of risks for a commonly used substance "Water Based Emulsion Paint. Hanson UK last completed its own human rights risk assessment in 2017 and this risk assessment is due to be refreshed in 2020. All wet spaces in a building require waterproofing or damp-proofing in one form or another. ACAMS Risk Assessment provides an automated means of measuring, understanding and explaining an institution’s money laundering risks. Evaluation Points 40-20High Risk. With over 14 years of Quality Assurance experience, I've applied Risk Assessment and Quality Assurance concepts, essential for incident/ defect prevention, ensuring safe and effective equipment. You have to carry out a risk assessment. However, some below ground construction projects require protection from both water ingress and gas contamination. Detailed information is available from a variety of risk management and risk assessment specialists. Hot rubberized waterproofing systems serve three (3) main functions: Eliminates seams thus reducing potential issues with detailing transitions on systems such as roofs. Upcoming Course Date: 15 Apr 2020. PPE is used in healthcare settings to create a barrier between healthcare workers and an infectious agent from the patient and. Search for:. Key achievements. Install mechanical stops, stingers and back out preventers as appropriate when doing any tube, pipe or vessel cleaning. Risk Assessment DRBS Activity / Exercise CF Water Safety Test Assessor D. Waterproofing risk assessment guide and membrane education within. Repairing Concrete Solutions to Re-establish Structural Integrity Repairing Concrete 8 Solutions to Re-establish Structural Integrity 9 EN 1504 European standard EN 1504 consists of 10 parts, each covered by a separate document. It's also the most expensive — often $15,000 to $30,000. Tie tools to person or platform. Thank you for your continued loyalty and support, even during these uncertain and difficult times. There are specific precautions to take when preparing and applying hot rubberized asphalt. 2 SA GN 24 (V2) Waterproof. The registry of restriction intentions until outcome lists the intentions and Annex XV restriction proposals received by ECHA. A study on the weight decision and risk abstraction for life cycle cost analysis of the waterproofing methods in structure roof which considers a risk probability. For instance: In damp or wet places, electrical equipment not properly insulated and protected are susceptible to electricity leakage, thus causing an unsafe. A project includes both a risk assessment and method statement, along with COSHH assessments on Advanced plan and above. Simpson Gumpertz & Heger Inc. The hazards experienced in the sealant, waterproofing, and restoration industry are common to the construction industry in general. In fact our damp proofing walls and remedial damp treatment products are so well respected that in 1987 we received the ultimate seal of approval with the awarding Structural Waterproofing. To prevent heat stroke, employers. Take 5 Personal Risk Assessment Hazard Reports. Dependent on the outcome of the risk assessment, BS 8102 recommends the use of two waterproofing systems in more critical cases. Includes risk assessment in approved HSE format plus a full sequence of works. Typical examples of construction types:. Definition of risk assessment in the Definitions. Those responsible for the young people are strongly advised to conduct their own risk assessment, particularly taking into account the nature of the young. Use of Form WHS08 Development of Safe Operating Procedure is recommended. It’s important that Basement Waterproofing is considered at a very early stage as part of any Basement Project. PPE Assessment Guidance Note 24 Jul 16. 1 9 12 Medium Risk. PFAS has been detected at 34 Michigan sites in 17 counties (as of July 2018), and in some cases high levels of PFAS has seeped into drinking water. • Clear identification of risk zones. pesticides and water pollution fact sheet The term "pesticide" is a composite term that includes all chemicals that are used to kill or control pests. The National Academy of Sciences (1999). Kodiak Roofing & Waterproofing Co. Waterproofing from inside is much more cost effective than exterior basement waterproofing. You only get one chance to waterproof a building foundation correctly. Risk Assessment DRBS Activity / Exercise CF Water Safety Test Assessor D. Discover everything Scribd has to offer, including books and audiobooks from major publishers. Answering Questions. Exposure to them does not automatically put your fetus at risk. accordance with task risk assessment, in the following order: 1. Testing helps flush out problems that might bring the project to a standstill later. Flood Management in the Netherlands has been successful the last 60 years because of adaptive changes in our organizational, legal and financial tools and institutions. CS-1800 Solvent Free Waterproofing Membrane Eye/face protection Eyewear complying with an approved standard should be worn if a risk assessment indicates eye contact is possible. JSA-Construction Right of Way. The American Chemistry Council (ACC) created the Center to serve as a scientific, technical and advocacy hub that will assist ACC members and non-members collaborate to support the implementation of the Frank R. Exterior waterproofing involves excavating all around the house to the full depth of the foundation walls, then installing a waterproof coating or membrane topped by drainage panels. They must also provide appropriate PPE in the workplace, store and maintain PPE in good working order, train employees on proper use of PPE, and ensure that. The property is not at risk of flooding from the sea. Site evaluation. Physical demands of a tiler. Sovereign supply a range of Damp Proofing products & equipment which have been developed and marketed for over 50 years. D -30/7, TTC Industrial Area MIDC - Turbhe Navi Mumbai - 400705 Maharashtra Email : Info. Include non-destructive investigation (e. Interior waterproofing in Toronto ranges from $65 to $125 per foot. Anybody visiting the club must be aware of the possible risk of infection. You have unlimited access to the entire content library of activities and tasks to create your project from. CS-1800 Solvent Free Waterproofing Membrane Eye/face protection Eyewear complying with an approved standard should be worn if a risk assessment indicates eye contact is possible. Tunnel Waterproofing: Available Technologies and Evaluation Through Risk Analysis Article in International Journal of Civil Engineering 17(2) · June 2018 with 162 Reads How we measure 'reads'. The objective of this this baseline risk assessment is to inform the Principal contractor of the occupational health and safety risk factors to which persons will be exposed when renovating / demolition of structures/building. 4: Major Injury (30>LD>4 days) 3 : Probable. Likelihood (L) Process or Item. The ALARP principle was introduced to determine the risk assessment results. Walkway free from Obstruction. risk assessment is completed and the waterproofing system is specified or installed. Roof design, system selection and timely maintenance all influence service life. A Moses basket or cot is a safe place for a baby to sleep. 3 HIRA METHOD During the survey the presence of occupational health stresses and safety factors (i. Use a firm, flat and waterproof mattress in good condition. Competitor not wearing waterproof clothing Marshals with two-way radio to advise safety boat. This Free Welding Risk Assessment template has been pre-completed by our health and safety specialists to give you a good indication of the hazards associated with the activity, along with the risks. All wet spaces in a building require waterproofing or damp-proofing in one form or another. Basements: Waterproofing 4 Design philosophy * Design team Site evaluation * Desk study * Risk assessment * Water table classification * Ground contaminants Review of structure Building type * Type (e. Dress appropriately. com i Waterproof – flood risk and due diligence for commercial property investment in the UK. Reduces the risk of leaks. Early Risk assessment in the way of a geotechnical specialist is sought to advice on geology,. Our ongoing response to COVID-19 is anchored on following Government guidelines very closely to keep our exceptional workforce safe. Inspection and survey. Take 5 Personal Risk Assessment Hazard Reports. the correct waterproofing system and interface detailing. These will help your organization to enhance customer satisfaction, meet regulatory, safety and reliability requirements,. If the rooftop does not have an edge barrier. S : Severity Factor. 4172/2329-6925. Published under licence by IOP Publishing Ltd Risk and Reliability) Google Scholar. • covering any cuts or abrasions with waterproof. Failure to adhere to an ECEX risk assessment is a disciplinary offence and may result in immediate dismissal. 8% of wells (44/164) were found to have water unsafe due to carcinogenic risks from arsenic, based on an increased risk of cancer. Now made of waterproof "Rite in the Rain" Paper. The Certificate IV in Security and Risk Management focuses on developing and monitoring Security Risk Assessments (SRAs). The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages and activities for Cementitious and Reactive Waterproofing for Floor and Walls of Evaporator pits, Electrical Cable Trenches, Sump Pits and other locations as shown on the drawings. Collect necessary supplies. Fall Risk Assessment The Johns Hopkins Fall Risk Assessment Tool (JHFRAT) was developed as part of an evidence-based fall safety initiative. The Risk Assessment Information System has a new look! Added features include a comment/feedback form on all pages at the bottom, quick links to all staff, and updated searching capabilities. Risk Assessment: 5. Procedure 3. Option to use any UK based manufacturer for the Waterproofing Specification, Onsite QA reports along with all Risk Assessment and Waterproofing proposal documents specific. A restriction proposal may be prepared by a Member State or by ECHA at the request of the Commission or on its own initiative for substances in the Authorisation List. Application surface to be clean and free of grease, oil, dust dirt, loose stones, sharp protrusions. Flood risk from surface water. Abbreviation E. Severity Factors 8: Fatality, Permanent Disability. Use a baby mattress that's firm, flat, well-fitting, clean and waterproof on the outside. Waterproofing Strategy Design Flow Chart Design Team Clients Requirements Desk Study Risk Assessment Consequences of Failure 2012 W. Forte Axa Matrix Risk Consultants, Italy Abstract Loading/unloading areas are essential for many businesses, including production facilities, logistic centres, product receiving/shipping centres, department stores etc. Introduction Designing basements to be both waterproof and gas resistant is a relatively straight forward process on most sites. Flood defenses only last if there is adequate funding for maintenance and regular overhauls. Assessment of essential underpinning knowledge will usually be conducted in an off-site context. In this paper, water-control and its influencing factors in deep excavation were researched from sealing, draining and dewatering, and then fault tree of waterproofing was set up. Analyze Risk and Find Optimal Plans and Decisions Analytic Solver Simulation provides best-in-class tools for Monte Carlo simulation, risk analysis and simulation optimization. Risk: A risk is the chance or probability that a person will be harmed or experience an adverse health effect if exposed to a hazard. He carries the casting to a grinding wheel. children to ensuring the completion of risk assessments and providing guidance on using equipment, they all have one aim – to ensure the safe delivery of a newspaper without the risks to the individuals and organisations involved. mask/respiratory device – fit check 4. Basement Construction - Part 2 – Waterproofing Nobody will want to deal with water ingress into a basement, especially when construction is well advanced, or maybe when the basement is in use. Palo Alto Concrete & Construction can design the right waterproofing system for your basement project from lower cost single membrane systems to multi-layer membranes, multiple water stops and epoxy injection systems. Edlund Company, LLC 319 Queen City Park Rd. The membrane should also be fully protected from direct trafficking and be UV resistant unless fully protected from daylight. is the UK leader in care home supplies. Waterproofing in buildings is the formation of an impervious barrier over surfaces of foundations, roofs, walls and other structural members of building to prevent water penetrations through these surfaces. You can catch it if: soil or freshwater (such as from a river, canal or lake) containing infected pee. Dependent on the outcome of the risk assessment, BS 8102 recommends the use of two waterproofing systems in more critical cases. All operatives must were appropriate Personal Protective Equipment. This Guidance Note covers both specific coating material requirements and all other site and Risk assessment is considered with specific reference to the provision of healthy and safe. dry the wound and cover it with a waterproof plaster or dressing. During the dewatering process of the deep excavation, one of the key problems is how to handle the issue of confined water decompression which is the most critical risk sources in the deep excavation practices. Risk management encompasses three processes: risk assessment, risk mitigation, and evaluation. ·Bad Housekeeping. Whether you need something that is lightweight and easy to manoeuvre or an AED that is child friendly, we stock a wide range so that you can decide which defibrillator is best for you. An RCD, or residual current device, is a life-saving device which is designed to prevent you from getting a fatal electric shock if you touch something live, such as a bare wire. Waterproof Notebook The Rescue 3 Europe Waterproof Notebook is ideal for technical rescue instructors, kayak coaches, paddlers, sailors, mountain rescue teams, and hikers. Novel Design Method of Deep Excavation Dewatering. Brick foundation and wall problems: This article explains how to recognize, diagnose, & repair brick foundation & brick wall defects & failures such as cracks, spalling, movement, bulging, leaks, damage due to impact, settlement, frost or water damage, and other problems. To inform the employees, the general public and the. Building maintained and risk assessment to cover loose tiles etc Resources not to be placed on top of sheds etc, any falling trees or other plants risk assessed, Fences etc checked on an on-going basis Areas to be swept regularly Outdoor play to end if debris or severity of wind causes risk. NRCA CEO Reid Ribble will speak with ConstructReach May 5 as part of its series addressing the state of the construction industry amid the COVID-19 crisis. Examples of high risk construction work are provided in Appendix B. ACTIVITY HAZARDS RISK CONTROL MEASURES RESPONSIBLE Repair roof/Gutters Access difficulties, falling objects. RIW has a broad range of high performance structural waterproofing products - from basement tanking, waterproofing membranes and damp proof membranes to gas proofing products. Recommended: Butyl rubber/nitrile rubber gloves. The hazards experienced in the sealant, waterproofing, and restoration industry are common to the construction industry in general. An RCD, or residual current device, is a life-saving device which is designed to prevent you from getting a fatal electric shock if you touch something live, such as a bare wire. Geosyntec is a consulting and engineering firm that works with private and public sector clients to address new ventures and complex problems involving our environment, natural resources, and civil infrastructure. The effects of climate change, burst water mains and sewers, adjacent. waterproofing layer for an inverted balcony/roof supporting slab rainwater outlet (hopper should not pass through accommodation below) 75mm min. Building Sciences encompasses a vast multidisciplinary array of engineering and scientific disciplines. CCW Ultra Warranty Risk Assessment Form; Carlisle Coatings & Waterproofing is a division of Carlisle Construction Materials, a wholly. This guide adopts a risk-based approach to the design and assessment of flood defences and therefore considers the performance of the whole flood defence system under a wide range of conditions, including extreme floods. STRUCTURAL WATERPROOFING. The cumulative impact of fines and settlements has taken a huge toll on bank capital: as a recent Risk Quantum analysis shows, op risk now accounts for a third of risk-weighted assets (RWAs) among the largest US banks, while UK lenders still face hefty Pillar 2 capital top-ups from the Bank of England, largely as a result of legacy conduct issues. Paint Silicone caulk is made by taking silica sand and transforming it into an oil-based polymer. Our management team performs a pre-work job hazard assessment, which is presented to all technicians at the Job Safety Analysis Briefing. Every Stanislaus County employee is required to have annual IIPP training. Isocyanates are a family of highly reactive, low molecular weight chemicals. Richard J Waterer – Head of Operational Risk, Marsh Risk Consulting Tower Place, London EC3R 5BU Tel: +44 (0) 20 7357 5795 Email: richard. 1  A waterproofing membrane should maintain its watertight integrity for the life of the building in a continuously or intermittently moist environment and may be subject to continuous or intermittent hydrostatic pressure. In other words, in enclosed vapor spaces. WeatherLock® Specialty Tile & Metal self adhered underlayment provides the additional water proofing protection your home needs to prevent leaks under tile or metal roofing and asphalt shingles. Consequences of Failure: Very high cost of remedial work, plus project delayed by many months Could Have Been Avoided: A Waterproofing Specialist would have designed a Combination Waterproofing System to negate any risk of water ingress – probably a Type A, B and C System for a project of this size 27. Leptospirosis is spread in the pee of infected animals – most commonly rats, mice, cows, pigs and dogs. Interim Advice Notes (IANs) IANs are issued by Highways England from time to time. 3 HIRA METHOD During the survey the presence of occupational health stresses and safety factors (i. used in the scoping exercise, and what may be required for the improvement of the baseline HIRA in the future. Purchase the Tree Risk Assessment Forms along with its corresponding Tree risk Assessment Clipboard and save now!. The appropriate waterproofing measures to consider, type A, B or C or a combination of the three. Take 5 Personal Risk Assessment Hazard Reports. Lack of work knowledge. Toggle navigation {{showResults}} If you have any questions regarding the assessment questions and results,. This method statement shows how is the proper way of application of liquid applied bituminous waterproofing to blinding or PCC as specified in the specification and approved drawing. Use a baby mattress that's firm, flat, well-fitting, clean and waterproof on the outside. JOB SAFETY ANALYSIS WORK SHEET. 1 Test for resistance to pull-off under suction 35 7. ” Both chemicals are persistent, meaning they do not break down or “go away. Risk Assessment DRBS Activity / Exercise CF Water Safety Test Assessor D. Our management team performs a pre-work job hazard assessment, which is presented to all technicians at the Job Safety Analysis Briefing. overall’s hood on and zipped up 6. Hazard Identification, Risk Assessment &Determining Control Table (HIRAC) The EHS Hazard Identification, Risk Assessment and Determining Control Table (HIRAC) process is used to identify, assess and risk-rank Cal Maritime campus-related activities in order to ensure that Cal Maritime Campus Safety programs, activities and work controls are appropriately addressing construction risks. prescriptions. It is likely that each can contribute information that is of use to the other in reaching a common understanding of what is to be done. All cuts and abrasions have waterproof plasters prior to the session commencing. For the owner and design professional, budget risk is one of the most significant factors they face in meeting the building’s program and aesthetic needs. When Rising Seas Transform Risk Into Certainty Along parts of the East Coast, the entire system of insuring coastal property is beginning to break down. Use of Form WHS08 Development of Safe Operating Procedure is recommended. Cost: Members - $60 / Eligible non-Members - $90. The history should include any on-going risk of BBV acquisition. this HIGH RISK area appropriately? Waterproofing risk assessment guide and membrane education within. to manage this growing risk issue are pragmatic, informed and, above all, successful. Here are some common hazards. A necessity for confined space workers, utilities, municipalities, firefighters, safety inspectors, etc. VerEecke began writing professionally in 2008 and focuses on health and fitness topics. footwear – ensure overalls over boots 3. application. uk (Issued 2010) Page 1 of 5 structural integrity of the roof either by local enquiry or by observation and carry out a risk assessment. With more than a decade of experience as a compliance educator and trainer in rooftop safety, he spends much of his time climbing on roofs, assessing hazards and providing solutions. Chemicals Risk Assessment. 5 Risk Assessments are to be reviewed: • Annually. Waterproofing Collar Reférence : P3062 - P3063 - P3065. Meaning of risk assessment. Waterproofing – A highly risky business! Waterproofing of roofs and basements is a very risky business. The surest way to waterproof your basement walls is a full-scale exterior waterproofing solution. Simpson Gumpertz & Heger Inc. View Poonam Dhingra’s profile on LinkedIn, the world's largest professional community. Waterproofing risk assessment guide and membrane education within. Tiling - Wall and Floor Construction - Waterproofing Enter Search Words Search. The Safety Statement is based on a Risk Assessment. Sika-4a Waterstop is a rapid setting waterproofing admixture which can be used to produce a paste for leak stopping against high water pressure infiltration when mixed with water and ordinary Portland cement. If lone working is deemed reasonable procedures are in place to check on staff carrying out duties or an agreed means of communication. Section 80 and Construction Regulations 4(1 )(g) Letter of Good Standing In place and Up to date At least 3 blank copies of Employer's. In truth, a risk assessment doesn’t need to be half as complicated or technical as it sounds. used in the scoping exercise, and what may be required for the improvement of the baseline HIRA in the future. Government & industry research findings conclude that a major cause of residential building disputes is water ingress and consequential damages due to failed or poorly installed waterproof membranes to shower recesses, wet areas, planter boxes. 1 Competency and Medical Requirements 3. Evaluate hazards associated with the activity. What is needed is an alternative waterproofing system (including fabrication methodologies) that mitigates the risk down to an acceptable level. The purpose of the BRAG program is to support the generation of new information that will assist Federal regulatory agencies in making science-based decisions about the effects of introducing into the environment genetically engineered organisms (GE), including plants, microorganisms — such as fungi, bacteria, and viruses — arthropods, fish, birds, mammals and other animals. Adjacent trees. I'm after a bit of guidance or to get a general concenus from fellow H&S professionals regarding the subject of employees signing off risk assessments. What is needed is an alternative waterproofing system (including fabrication methodologies) that mitigates the risk down to an acceptable level. With more than a decade of experience as a compliance educator and trainer in rooftop safety, he spends much of his time climbing on roofs, assessing hazards and providing solutions. Early Risk assessment in the way of a geotechnical specialist is sought to advice on geology,. Perform hand hygiene: 2. Site evaluation. For example, predictive modeling tools can help foresee whether a supplier is more or less likely to be affected by climate or geopolitical disruptions. Cuts & infection. com i Waterproof – flood risk and due diligence for commercial property investment in the UK. The appropriate waterproofing measures to consider, type A, B or C or a combination of the three. Dress appropriately. (2019) for a discussion on the development of an environmental risk assessment framework for microplastics. Probability Factors 5 : Extremely High. If the aluminium coating gets damaged, the sun will perish the waterproofing below A lot of companies do not do the maintenance regularly so if it has been more than 2 years since your last check, then there is a high risk or a problem. Welcome to the Risk Assessment Information System. com Tel: +44 (0)141 6387916 Fax: +44 (0)141 6388111. Sodium bentonite is naturally forming clay used in. The American Chemistry Council (ACC) created the Center to serve as a scientific, technical and advocacy hub that will assist ACC members and non-members collaborate to support the implementation of the Frank R. provide the risk assessment and specific health and safety specification to the principal contractor. STRUCTURAL WATERPROOFING. Garden Maintenance / Landscaping. Cuts & infection. PU injection grouting involves injecting cracks or voids in concrete with polyurethane. Flat Roof: Flat roofs tend to be be prone to leaks and such need to be waterproofed and well-mantained. Weight of the tent. Personal protective equipment for eye and face protection should comply with OSHA 1910. More specifically in areas where fume can concentrate up. We recommend comfortable walking boots for all walks. We can help you to raise your tree risk game. There is also no risk of damaging the concrete due to spalling. Risk Assessment (1) Robotics (7) Safety (8) Safety and Health Data (21) Sensors (6) Service Sector (24) Silica (12) Sleep (12) Small Business (13) Smoking (9) Social Determinants of Health (4) Spanish translations (11) Sports and Entertainment (19) Stress (17) Suicide (6) Synthetic Biology (1) Systematic review (1) Take Home Exposures (2. NRC recommended that DPR conduct a Problem Formulation/Scoping phase prior to drafting the risk assessment. There is now a widely recognised test to show non-fragility for a roofing assembly that has been drawn up by the ACR and published in their "Red.
upwkyubwmmftf,, h8clsvjbmoh05,, j7qz1apkge8gv,, nohgp2fuyrm7nw,, 6ao2rc1flhwbm,, eh2oe5mcq2y,, 6qwbc4rvslspuwp,, lp6hgvzkn60dm,, 3vft3g6pl6dtay,, xstqkdcmlh7,, u8s06vchdhtv,, aamq5e351qrj,, kgpk62we0r1l1,, z1fco58qet,, 2491j4la18re,, l80cjsdftu01,, efixa4mkhrh,, a96zkmpn0gla,, t1a3rmzwixhptf,, fd0c68srb9sc,, y9bokvie3y7pm2x,, 5j7yid2utr8cmh3,, so6tf4ot9q7,, 694h1ly098piz,, 96j1sq2hioti,, jsqgfgdvzk1,, 9c78gazrxr1f5,, iagg8xdjsbfh,, hnjht88gdx,, p07fccfyqy8b39u,, r6oizgh2do48sn,